
WestPower Energy Ongoing Support
Location USA Project Description Long term technical expertise and review was needed to support the development of several power plants. Outcome PRE provided open-ended technical
Location USA Project Description Long term technical expertise and review was needed to support the development of several power plants. Outcome PRE provided open-ended technical
Location Farmington, NM Project Description A utility needed a standard developed for their protective relaying that brought about greater consistency in all facets of their
Location USA Project Description In order to ensure NERC compliance, an experienced engineer was required to review relay settings for 20 generation sites and continually
Location San Luis Valley, CO Project Description A new 115kV substation with two new transmission lines and one generator interconnect required the development of new
Location Boulder, CO Project Description New transmission lines, as well as a new transformer and distribution switchgear were being installed which necessitated the development of
Location Denver, CO Project Description Due to a transformer failing, an emergency installation of a spare transformer was needed to be done within an accelerated
Location Greeley, CO Project Description This was a two stage project in which large scale upgrades where necessary for the substation, including rebuilding the existing
Location Greeley, CO Project Description In order to support system upgrades, a rebuild of a large existing substation, which included three transmission lines, two distribution
Location Denver, CO Project Description The client needed to install two DFRs for their 115kV and 230kV transmission assets. Outcome PRE provided the design, preliminary
Location Morrison, CO Project Description An emergency replacement of a failed RTU in a substation required fast design and field support. Outcome Understanding the urgency
Expertise to Engineer the Future