Location Moss Landing, CA Project Description The design of a new 300MW, 1200MWh Energy Storage System Installation on a 500KV Interconnection to be installed at the Moss Landing Power Plant required various system studies and other support during it’s design. Outcome As the System Analysis Consultant for the project, PRE provided detailed analysis of Reactive […]

Article: In Boost for Renewables, Grid-Scale Battery Storage Is on the Rise

What an exciting time we are living in! PRE, Inc. is proud to have performed many of the power systems analysis and studies as a part of the design of the Moss Landing Energy Storage Facility mentioned in this fascinating article. In Boost for Renewables, Grid-Scale Battery Storage Is on the Rise By Cheryl Katz […]